Spez
VisitorMember since Feb 20, 2019
- Parks
- 2
- Downloads
- 6
- Ratings
- 1
- Avg. Rating
- 4.5
- Forum Posts
- 24
Spez projects (Kings Island NL2, 360 degree videos + small updates)
I take this opportunity to re-organize those phases. Considering the time it takes to do this, the subsequent phases will consist of one major coaster only (with surroundings). That being said, phase 2 will still be a ta...
Spez projects (Kings Island NL2, 360 degree videos + small updates)
I added some buildings to The Beast. Chain lift sheds: Also, the entrance The octagonal tower for Vortex as well as staircases and catwalks Finally, things like lockers and other small structures I think the next update...

Spez projects (Kings Island NL2, 360 degree videos + small updates)
Absolutely. It should be ready in a few weeks. Still many details to add.
Spez projects (Kings Island NL2, 360 degree videos + small updates)
I have been working mainly on Vortex station as the pictures will tell. I also performed some scenery and script tests for the train and White River Canyon. Those are not pictured yet. Not all the tests were conclusive....

Spez projects (Kings Island NL2, 360 degree videos + small updates)
After a short break, I resumed work on Kings Island NL2. I finished the supports for Vortex and started on 3d models. First, a glimpse of what will become the train. It may not look like much, but this will be the front...

Spez projects (Kings Island NL2, 360 degree videos + small updates)
This last week, I have been mainly reworking Vortex, correcting mistakes, tweaking the track and a lot of support job. It is about 75% done. When done, I'll jump in the 3d modeling for the station, and other coaster acce...

Spez projects (Kings Island NL2, 360 degree videos + small updates)
The station is almost finished. I'm just struggling a bit with the contraption at the front which used to be a fountain. Regardless, I'm quite happy with it. First, the skeleton Then, the result Inside. Note the ceiling,...

Screen Shot Saturday Madness! - Gallery Posted 12/12/2020
Here's a few shots from The Beast (by me). I think I prefer the last one.

Spez projects (Kings Island NL2, 360 degree videos + small updates)
I will get it. Banshee is in phase 4 as it is, so it will be months (most likely) before I get there. But it's good to gather more tools ahead of the work to be done. Thanks for the tip! SirMaverick34, is it the same M34...
