Skip to content

How do I back a train onto the transfer table?

1 to 13 of 13
Posted March 26, 2026· Edited March 26, 2026

On my coaster, right after the home brakes comes the transfer table, then the station. Parallel to the station is the storage track.

Getting the train onto the storage track is easy. However, when I want to get the train out of the storage track and back onto the transfer table to move it onto the main line, the BWD button on the storage track won't illuminate. What am I doing wrong?

Skye posted on March 26th, 2026

On my coaster, right after the home brakes comes the transfer table, then the station. Parallel to the station is the storage track.

Getting the train onto the storage track is easy. However, when I want to get the train out of the storage track and back onto the transfer table to move it onto the main line, the BWD button on the storage track won't illuminate. What am I doing wrong?

The train might be in the incorrect spot on the Transfertable. a few feet makes a lot of difference.

Posted March 27, 2026· Edited March 27, 2026

MrRC posted on March 26th, 2026

The train might be in the incorrect spot on the Transfertable. a few feet makes a lot of difference.

The train isn't on the transfer table, it's on the storage track.

The message by the "storage track" label on the control panel's "block" tab says that it's waiting for a clear block before it will let me move the train out of storage; i.e. NoLimits thinks there's a train sitting on the transfer table, but there isn't.

Skye posted on March 28th, 2026
Nope. The blue button doesn't illuminate in full manual either.

Is there space enough for the train on the track ? (if answer is yes then try to reduce the numbers of trains to 1)

MrRC posted on March 28th, 2026

Is there space enough for the train on the track ? (if answer is yes then try to reduce the numbers of trains to 1)

Yes there is enough space for the train on the track. I tried running it with one train, though, just to see, and still no luck. It looks like there's a bug in the program.

Skye posted on March 28th, 2026

Yes there is enough space for the train on the track. I tried running it with one train, though, just to see, and still no luck. It looks like there's a bug in the program.

Send me your PKG file to my email (see my profile)

MrRC posted on March 29th, 2026

Yes there is enough space for the train on the track. I tried running it with one train, though, just to see, and still no luck. It looks like there's a bug in the program.

Send me your PKG file to my email (see my profile)

Done, thanks :)

Posted March 29, 2026· Edited March 29, 2026

Got your mail and i updated the park.
U can't do with out transport coz the train starts to move towards the station then u can't switch to Automatic mode coz the train is moving at 0,5 mph.

So i made a change to the TransferTable and did send u the mail back with the modified park.

Posted March 30, 2026· Edited April 1, 2026

MrRC posted on March 29th, 2026

Got your mail and i updated the park.
U can't do with out transport coz the train starts to move towards the station then u can't switch to Automatic mode coz the train is moving at 0,5 mph.

So i made a change to the TransferTable and did send u the mail back with the modified park.

Hi, thanks for that. What changes did you make other than ticking the box to enabling the transport device on the transfer table? When I enable the transport device on my file (as I sent it to you) the train reverses straight through the transfer table and out the other end, but in your version which you sent me it stops on the table.

Edit: brilliant, I fixed it by centering the transport mechanism switch location to the middle of the table, setting the speed as slow as possible and then setting the acceleration and deceleration values to 0.1 and it now works well enough as a 1920s gravity-powered transfer. :)

Skye posted on March 30th, 2026
Edit: brilliant, I fixed it by centering the transport mechanism switch location to the middle of the table, setting the speed as slow as possible and then setting the acceleration and deceleration values to 0.1 and it now works well enough as a 1920s gravity-powered transfer. :)

No problem, i got your email. Hopefully we can colab some time to make any project to a succes.

1 to 13 of 13